The document collection / Change order

Change Order Template

Record a change to a contracted project with original and revised amounts, the net adjustment, reason, and authorizer. Keep the financial impact of scope changes visible.

Paper format
Letter
Included
HTML layout + sample JSON
Customization
Content, colors, typography
Rendering
Handlebars + Chromium

Preview the sample document, then make it yours. Change the layout in your editor or clone it into your RelayPDF dashboard to create an editable draft.

Open full-size preview
RELAYPDF / DOCUMENT COLLECTION
Letter HTML → PDF
Make it work for you

From a sample to
your next document.

This layout uses standard HTML and CSS with Handlebars fields. The preview is rendered from the downloadable source and sample data shown below.

Use the sample as a starting point. Your application supplies dates, labels, and calculated amounts; the template handles their presentation.

  1. Personalize the design

    Update the organization name, typography, and CSS accent colors. Replace the sample wording with content appropriate to your business.

  2. Connect your data

    Keep the field structure in the sample JSON and replace its values. Repeating arrays create the document’s rows or sections.

  3. Preview, publish, generate

    Test with your longest content. Publish the draft, then generate PDFs using its templateId and fresh templateData.

What you can customize

FieldPurpose
numberYour document reference; use a stable, unique identifier.
issuedOnDate supplied by your application; ISO dates work with the template’s date formatter.
contractRefEditable document content. Replace the sample value with your own data.
projectEditable document content. Replace the sample value with your own data.
contractorStructured details for this section. Match the nested fields in the sample JSON.
ownerStructured details for this section. Match the nested fields in the sample JSON.
itemsRepeatable line items; each object becomes a row.
netChangeEditable document content. Replace the sample value with your own data.
currencyISO currency code used by the money formatter, such as USD.
reasonEditable document content. Replace the sample value with your own data.
authorizedByEditable document content. Replace the sample value with your own data.

Start with real sample data

Download sample JSON ↓
Inspect sample JSON
templateData / JSON
{
  "number": "CO-07",
  "issuedOn": "2026-03-18",
  "contractRef": "C-4412",
  "project": "Harborpoint warehouse, dock 3",
  "contractor": {
    "name": "Northline Press",
    "address": "184 Canal Street\nBrooklyn, NY 11231"
  },
  "owner": {
    "name": "Harborpoint Realty",
    "address": "90 Pier Road\nJersey City, NJ 07302"
  },
  "items": [
    {
      "description": "Dock leveler seals, bay 3",
      "original": 1840,
      "revised": 2460,
      "delta": 620
    },
    {
      "description": "Photo-eye reset, door 3B",
      "original": 420,
      "revised": 420,
      "delta": 0
    },
    {
      "description": "After-hours access premium",
      "original": 0,
      "revised": 380,
      "delta": 380
    }
  ],
  "netChange": 1000,
  "currency": "USD",
  "reason": "Existing seals were scored beyond the allowance in C-4412. Access after 6pm to keep the dock live.",
  "authorizedBy": "Priya Raman"
}

Clone through the API

POST /v1/templates
curl https://api.relaypdf.com/v1/templates \
  -H "Authorization: Bearer $RELAYPDF_API_KEY" \
  -H "Content-Type: application/json" \
  -d '{"name":"Change Order Template","galleryId":"change-order"}'

This creates an account-owned draft. Publish it before using its slug or UUID as templateId with templateData on POST /v1/pdf. Follow the complete template workflow →

Will the PDF match this preview?

The preview uses the same HTML and sample data included with this template. RelayPDF renders HTML using Chromium. Use the document’s intended Letter paper size and enable print backgrounds. Review page breaks when you add longer content or more rows.

Can I use my own branding and data?

Yes. Edit the HTML and CSS, replace the sample values, and keep the field names your template expects. Save your customized draft in the dashboard and publish a version when it is ready for your application.

Keep exploring.